This project continues our improvements on Trunk Road Extension South.
Phase II of the project ended at Fetlock Drive.
Starting at Fetlock, Phase III will add height to the road embankment, remove the old bridge over Wasilla Creek and construct a new bridge addressing pedestrian, flooding, and safety considerations. This project will provide the connection between the pedestrian/bike pathway that ends at Fetlock Drive and the pathway to Machetanz Elementary School that starts just south of the bridge.
The project purpose and need is to respond to Alaska Department of Transportation (ADOT) bridge inspections that indicate a need to limit weight loads by 50% as well as repair failing abutments on the existing bridge. The current bridge and roadway have no shoulders for bike or pedestrian traffic.
Improves safety and reduces traffic congestion in a critical area of growth and development.
Provides alternative access to a number of existing large subdivisions and proposed residential and commercial developments south of the Parks Highway.
Provides improved access to three large subdivisions and Machetanz Elementary School.
Bob Walden, P.E., MSB Project Manager
MSB Public Works
Phone: (907) 861-7726
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.
Brad Sworts, Manager
MSB Public Works
Phone: (907) 861-7715
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.