Scope

This project will improve drainage capacity in this flood channel area of the Little Susitna River. This will involve clearing the right-of-way, elevating the surface of the road and deepening and widening the ditching on either side of the road.

(Photo below is the roadway close to being overtopped)

Sushanna Dr ditch

The existing cross culverts also need to be enlarged to accommodate flood events.

(Photo below is culvert at capacity)

Sushanna Dr Culvert 2

After construction, rip rap will be added to stabilize the soil on road embankment sides and around the culvert to protect from fast flowing water.

 

 

Project Benefits

This Project:

  • Elevates the roadway to reduce overtopping of the road during flood events
  • Reduces or eliminates risk of storm water hazards
  • Stabilizes the soil around the roadway and culverts

Project Status

Design status is 65% complete, waiting on funding for the remainder of the project. A complete Hazard Mitigation Grant has been submitted to FEMA.

Contacts

Bob Walden, MSB Project Manager

1-907-861-7726

This email address is being protected from spambots. You need JavaScript enabled to view it.

Brad Sworts, Manager

Pre-Design & Engineering Division

Capital Projects Department

1-907-861-7715

This email address is being protected from spambots. You need JavaScript enabled to view it.

Project Docs

Project Fact Sheet - October 2020 (pdf 247.01 KB)   |  861 hits

Project Cost

Construction: $499,940
Professional Services: $316,100
Right-of-Way Acquisition: $65,585

Total Estimated Project Cost: $881,660